Projects
Newly Constructed Barge Launch – February 2015
Click on the link below to watch our newly constructed barge being launched from our river yard into the Ohio River.
Front End Loader Recovery – December 8, 2015
M.B.I. supplies equipment and labor to remove a 25 ton Front End Loader from 30 foot deep water in the Ohio River.
New Boat Dock – June 2016
M.B.I. installs a new boat dock with 90 foot pipe piles in Newburgh, Indiana.
Barge Repair and Flip – August 10, 2016
M. Bowling, Inc. installed new bottom on Barge Number ME 9128 and rolled back up right.
City of Henderson SWWTP – Renovation of Aeration Basin # 4
2018 New Barge Construction
200′ x 45′ x 10′