Projects

Newly Constructed Barge Launch – February 2015

Click on the link below to watch our newly constructed barge being launched from our river yard into the Ohio River.

Barge Launch

 

Front End Loader Recovery – December 8, 2015

M.B.I. supplies equipment and labor to remove a 25 ton Front End Loader from 30 foot deep water in the Ohio River.

 

 

New Boat Dock – June 2016

M.B.I. installs a new boat dock with 90 foot pipe piles in Newburgh, Indiana.

 

 

Barge Repair and Flip – August 10, 2016

M. Bowling, Inc. installed new bottom on Barge Number ME 9128 and rolled back up right.

 

 

 

City of Henderson SWWTP – Renovation of Aeration Basin # 4

 

 

 2018 New Barge Construction

200′ x 45′ x 10′